Biomethanation & Composting Plant
Pinto, Madrid, Spain
FIRST PRIZE. European Competition
-
Program: Biomethanation and composting plant
Year: 2001-2003
Status: Built
Area: 24.925 m2
Client: Consejería De Gestión Y Desarrollo del Medio Ambiente. Comunidad De Madrid.
Structure / MEP: INTECSA-INARSA, S.A
We built a platform three meters high, surrounded by the trees and closed with translucent walls, to accommodate an excavated volume in which are located the offices, locker rooms and warehouses in two floors, and gymnasium in one, with double height, and natural illumination from above. The metal mesh system allows the protection of facilities and the growth of vegetation around them. This arrangement allows to use the roof, as an outdoor gym or as tennis-courts.